Bailey's Harbor Dredging Project – In Progress

Trusted Experts in Marine Dredging Operations

The project encompassed a comprehensive mechanical dredging operation that removed approximately 9,000 cubic yards of sediment and debris from the designated area. In addition to this extensive excavation, the scope included installing a turbidity barrier to minimize water-quality impacts during dredging. Furthermore, the project involved dewatering techniques to separate water from the dredged material, followed by the hauling of the excavated material to a designated disposal site.