R1VER Floating MarinaSummerset’s work speaks for itself.
Summerset Marine successfully completed the River One Milwaukee floating dock project. The scope of work included the supply and installation of new floating dock sections, gangways, and gangway abutments.
Crane-Assisted Pier Placement: A crane lifts and positions a pier section into place while crew members guide alignment and ensure proper installation on the waterfront structure.
Floating Dock Layout in Progress: Multiple floating dock sections are staged and aligned on the water, with layout lines visible for precise spacing and positioning.
Floating Dock Layout in Progress: Multiple floating dock sections are staged and aligned on the water, with layout lines visible for precise spacing and positioning.
Gangway Connection to Dock System: A newly installed aluminum gangway provides access from shore to the floating dock system, with additional dock sections staged nearby.
Dock Framing and Deck Installation: Crew members work on assembling and securing the structural framing of dock sections prior to installing composite decking materials.
Completed Dock Walkway Installation: A finished composite dock walkway extends over the water, connecting to multiple slips and showcasing the completed marina system.

